BCD-24: Data Backups
Mechanisms exist to create recurring backups of data, software and/or system images, as well as verify the integrity of these backups, to ensure the availability of the data to satisfy Recovery Time Objectives (RTOs) and Recovery Point Objectives (RPOs).
Renumbered: Formerly BCD-11 in SCF 2025.4.
Control Question: Does the organization create recurring backups of data, software and/or system images, as well as verify the integrity of these backups, to ensure the availability of the data to satisfy Recovery Time Objectives (RTOs) and Recovery Point Objectives (RPOs)?
General (52)
US (23)
EMEA (23)
| Framework | Mapping Values |
|---|---|
| EMEA CHE FINMA Circular 2023/1 | IV.B.c-56 |
| EMEA Germany BAIT 2017 | 8.7 |
| EMEA Germany C5 2026 | OPS-06.01B OPS-06.01B.1 OPS-06.01B.3 OPS-06.01B.6 OPS-06.01B.7 OPS-06.01AS OPS-06.01AS.1 OPS-06.01AS.3 OPS-06.01AS.6 OPS-06.01AS.7 OPS-07.01B OPS-07.02B OPS-07.01AC OPS-09.02B OPS-09.03B CRY-16.01B PI-01.01B.4 DEV-11.01B |
| EMEA Spain CCN-STIC 825 | mp.info.6 |
| EMEA Spain Royal Decree 311 2022 | Article 26 |
| EMEA EU DORA 2023 | Article 12.1 Article 12.1(a) Article 12.1(b) Article 12.2 |
| EMEA EU DORA RTS 2024 | Article 8.2(b)(i) Article 39.2(g) |
| EMEA EU EBA GL/2019/04 | 3.5.57 |
| EMEA EU NIS2 2022 | Article 21.2(c) |
| EMEA EU NIS2 Annex 2024 | 4.1.2(g) 4.2.1 4.2.2(b) 4.2.2(c) 4.2.2(f) |
| EMEA UK CAF 4.0 | B5.c |
| EMEA UK DEFSTAN 05-138 2024 | 2504 2505 |
| EMEA UK DEFSTAN 05-138 - L1 2024 | 2504 |
| EMEA UK DEFSTAN 05-138 - L2 2024 | 2505 |
| EMEA UK DEFSTAN 05-138 - L3 2024 | 2505 |
| EMEA Israel CDMO 2.0 | Appendix A, 14.1 |
| EMEA LUX CCSF 20/750 2020 | 3.5-57 |
| EMEA LUX CCSF 22/806 2022 | 28 50 |
| EMEA Saudi Arabia IoT CGIoT-1 2024 | 2-8-1 2-8-2 |
| EMEA Saudi Arabia CSCC-1 2019 | 2-8-1-1 2-8-1-2 2-8-1-3 |
| EMEA Saudi Arabia ECC-1 2018 | 2-4-3-3 2-9-3-1 2-9-3-2 |
| EMEA Saudi Arabia OTCC-1 2022 | 2-8-1-1 2-8-1-3 |
| EMEA Saudi Arabia SACS-002 2022 | VII.B.TPC-64 |
APAC (14)
| Framework | Mapping Values |
|---|---|
| APAC Australia CCM 2026 | PRO-10 |
| APAC Australia Essential 8 2024 | ISM-1511 ISM-1811 |
| APAC Australia ISM June 2026 | ISM-1511 ISM-1547 ISM-1548 ISM-1811 |
| APAC China Cybersecurity Law 2017 | Article 34(3) |
| APAC India RBI Digital Payments 2021 | 70.b |
| APAC India SEBI CSCRF 2024 | PR.IP.S7 PR.IP.S8 RC.RP.S4 |
| APAC Japan ISMAP | 12.3 12.3.1 12.3.1.1 12.3.1.2 12.3.1.3 12.3.1.4 12.3.1.5 12.3.1.11 12.3.1.12 12.3.1.13 12.3.1.14 12.3.1.16.P 12.3.1.17.P 12.3.1.18.P 12.3.1.21.P 12.3.1.24.P |
| APAC Malaysia RMiT 2025 | 10.44 10.44(a) 10.44(b) A10-B5(a) A10-B5(a)(i) A10-B5(c) |
| APAC New Zealand HISF Microsmall 2023 | HMS11 |
| APAC New Zealand HISF MLHSP 2023 | HHSP17 HHSP56 HHSP69 HML17 HML56 HML68 |
| APAC New Zealand HISF Suppliers 2023 | HSUP15 HSUP48 HSUP60 |
| APAC New Zealand NZISM 3.9 | 6.4.6.C.01 |
| APAC Singapore CCOP CII 2026 | 8.1.1 8.1.2 8.1.5 |
| APAC Singapore MAS TRM 2021 | 8.4.1 8.4.2 |
Americas (5)
| Framework | Mapping Values |
|---|---|
| Americas Argentina Reg 132 2018 | D D.1.1-1 |
| Americas Bermuda BMACCC 2020 | 6.14 |
| Americas Canada ITSP-10-171 2025 | 03.08.09.A |
| Americas Canada OSFI B-13 2022 | 2.9.1 |
| Americas Canada OSFI Self-Assessment Guidance | 2.9.1 |
Capability Maturity Model
Level 0 — Not Performed
Practices are non-existent, based on the inability to demonstrate an implemented and operational capability. A reasonable person would conclude the control is not being performed.
Level 1 — Performed Informally
Business Continuity & Disaster Recovery (BCD) domain capabilities are ad hoc and inconsistent. Capability criteria associated with this control may include: ▪ Policies, standards & procedures associated with BCD domain capabilities provide limited coverage due to the depth and breadth of the existing documentation. ▪ Contingency management-related activities are decentralized (e.g., a localized/regionalized function) and uses non-standardized methods to implement secure, resilient and compliant practices. ▪ Limited technologies exist to support near real-time network infrastructure failover (e.g., redundant ISPs and redundant power). ▪ Backups are performed ad-hoc and focus on business-critical Technology Assets, Applications, Services and/or Data (TAASD). ▪ IT and/or cybersecurity personnel use a backup methodology (e.g., grandfather and father & son rotation) to create backups to support business needs (e.g., Recovery Time Objectives). ▪ Limited technologies exist to conduct full, incremental or differential backups (e.g., tape/disk, hybrid cloud or direct-to-cloud). ▪ Backups of sensitive/regulated data are cryptographically protected to prevent the unauthorized disclosure and modification of backup information.
Level 2 — Planned & Tracked
Business Continuity & Disaster Recovery (BCD) capabilities are requirements-driven, but are not standardized across the entity (e.g., local/regional level consistency). Capability criteria associated with this control reasonably expect the following criteria to exist: ▪ Policies and standards associated with BCD domain capabilities are formally documented and centrally-managed by the entity. ▪ Standardized Operating Procedures (SOP) associated with BCD domain capabilities are documented and maintained by process owners. ▪ IT and/or cybersecurity personnel work with business stakeholders and process owners to appropriately scope and reasonably implement cybersecurity and data protection controls associated with BCD domain capabilities to address applicable statutory, regulatory and/or contractual requirements for Technology Assets, Applications, Services and/or Data (TAASD). ▪ Business Continuity / Disaster Recovery (BC/DR)-related controls are primarily administrative and preventative in nature (e.g., policies, standards and procedures & guidelines). ▪ BC/DR may be a defined function (e.g., team or department) or assigned as an additional duty to existing IT and/or cybersecurity personnel. ▪ Appropriate TAASD exist to conduct full, incremental and/or differential backups (e.g., tape/disk, hybrid cloud or direct-to-cloud). ▪ IT personnel configure business-critical Technology Assets, Applications and/or Services to transfer backup data to the alternate site(s) at a rate that is capable of meeting RTOs and RPOs. ▪ The backup methodology is sufficient to support RTOs and RPOs for critical business functions. ▪ IT personnel store backups in a secondary location, separate from the primary storage site (e.g., cloud-based storage).
Level 3 — Well Defined
Business Continuity & Disaster Recovery (BCD) capabilities are standardized across the entity for applicability to People, Processes, Technologies, Data and/or Facilities (PPTDF) to ensure consistency for Technology Assets, Applications, Services and/or Data (TAASD). Capability criteria associated with this control reasonably expect the following criteria to exist: ▪ Policies and standards associated with BCD domain capabilities are formally documented and centrally-managed by the entity's Governance, Risk & Compliance (GRC) team, or similar function. ▪ Standardized Operating Procedures (SOP) associated with BCD domain capabilities are well-documented and kept current by process owners. ▪ A Business Continuity & Disaster Recovery (BC/DR) team, or similar function, is appropriately staffed and supported to implement and maintain BCD domain capabilities. ▪ Technology is leveraged to enhance the efficiency and accuracy of BC/DR operations (e.g., BC/DR planning software, Disaster Recovery as a Service (DRaaS), Orchestration and Automation Tools). ▪ The entity's Governance, Risk & Compliance (GRC) team, or similar function, works with business stakeholders and process owners to appropriately scope and reasonably implement cybersecurity and data protection controls associated with BCD domain capabilities to address Minimum Compliance Requirements (MCR) (e.g., applicable statutory, regulatory and/or contractual requirements) and Discretionary Security Requirements (DSR) (e.g., entity-required controls). ▪ An implemented and operational capability exists to create recurring backups of data, software and/or system images, as well as verify the integrity of these backups, to ensure the availability of the data to satisfy Recovery Time Objectives (RTOs) and Recovery Point Objectives (RPOs).
Level 4 — Quantitatively Controlled
Business Continuity & Disaster Recovery (BCD) capabilities, in addition to being standardized across the entity and centrally managed to ensure consistency across Technology Assets, Applications, Services and/or Data (TAASD), efforts are metrics driven to provide sufficient insight for decision makers to predict optimal performance, ensure continued operations and/or identify areas for improvement. Capability criteria associated with this control reasonably expect the following criteria to exist: ▪ Applicable SCR-CMM Level 3 (Well Defined) capabilities are implemented and operational. ▪ Metrics reporting includes quantitative analysis of Key Performance Indicators (KPIs). ▪ Metrics reporting includes quantitative analysis of Key Risk Indicators (KRIs). ▪ Scope of metrics, KPIs and KRIs covers organization-wide cybersecurity and data protection controls, including functions performed by third-parties. ▪ Organizational leadership maintains a formal process to objectively review and respond to metrics, KPIs and KRIs (e.g., monthly or quarterly review). ▪ Based on metrics analysis, process improvement recommendations are submitted for review and are handled in accordance with change control processes. ▪ Business and technical stakeholders are involved in reviewing and approving proposed changes to evolve capabilities.
Level 5 — Continuously Improving
Utilize SCR-CMM Level 3 or Level 4 (if available) criteria definitions: ▪ There are no defined Level 5 criteria, since it is reasonable to assume a continuously-improving process is not necessary to operationalize this control. ▪ Level 5 capabilities should be considered “world-class” where the control builds on Level 4 capabilities, but are continuously improving through Artificial Intelligence (AI) and/or Machine Learning (ML) technologies. ▪ While it may be possible to develop responsive capabilities for this control through the use of AI and/or ML technologies, the criteria would be organization-specific to define.
Assessment Objectives
- BCD-24_A01 the confidentiality of backup sensitive / regulated data is protected at storage locations.
- BCD-24_A02 system components for which to conduct backups of user-level information are defined.
- BCD-24_A03 the frequency at which to conduct backups of user-level information consistent with recovery time and recovery point objectives is defined.
- BCD-24_A04 the frequency at which to conduct backups of system-level information consistent with recovery time and recovery point objectives is defined.
- BCD-24_A05 the frequency at which to conduct backups of system documentation consistent with recovery time and recovery point objectives is defined.
- BCD-24_A06 backups of user-level information contained in system components are conducted frequently.
- BCD-24_A07 backups of system-level information contained in the system are conducted frequently.
- BCD-24_A08 backups of system documentation, including security- and privacy-related documentation are conducted frequently.
- BCD-24_A09 the confidentiality of backup information is protected.
- BCD-24_A10 the integrity of backup information is protected.
- BCD-24_A11 the availability of backup information is protected.
Evidence Requirements
- E-BCD-10 Data Backups
-
Documented evidence of a Continuity of Operations Plan (COOP)-related data backup scheme that demonstrates the methods of data backup (including protection measures) for all data types to ensure business continuity requirements.
Business Continuity - E-BCD-11 Data Backups - Local
-
Documented evidence of event logs for the on-site / local data backup solution.
Business Continuity - E-BCD-12 Data Backups - Remote
-
Documented evidence of event logs for the off-site / remote data backup solution.
Business Continuity
Technology Recommendations
Micro/Small
- Disaster Recovery Plan (DRP)
- 3-2-1 backup rule (3 copies, 2 media types, 1 offsite)
- Cloud backup service (e.g., Backblaze B2, iDrive, Veeam Agent Free)
Small
- Disaster Recovery Plan (DRP)
- 3-2-1 backup strategy (on-site + off-site/cloud)
- Cloud backup service (e.g., Acronis, Veeam, Azure Backup)
Medium
- Disaster Recovery Plan (DRP)
- 3-2-1-1 backup strategy (including immutable/offsite copy)
- Enterprise backup solution (e.g., Veeam Backup & Replication, Acronis Cyber Backup)
Large
- Disaster Recovery Plan (DRP)
- Immutable backup copies (air-gapped or object-locked S3/Azure Blob)
- Enterprise backup platform (e.g., Veeam, Commvault, Cohesity)
- Automated backup testing and alerting
Enterprise
- Disaster Recovery Plan (DRP)
- Enterprise backup platform with immutable storage (e.g., Commvault, Veeam, Rubrik)
- Ransomware-resilient backup architecture (air-gap or immutable)
- Automated backup validation and recovery testing
- Backup data encrypted at rest and in transit