Skip to main content

PRM-09: Security, Compliance & Resilience Requirements Definition

PRM 9 — Critical Identify

Mechanisms exist to proactively govern Technology Assets, Applications and/or Services (TAAS) by: (1) Defining technical security, compliance and resilience requirements; and (2) Performing a criticality analysis at predefined decision points in the Secure Development Life Cycle (SDLC).

Renumbered: Formerly PRM-05 in SCF 2025.4.

Control Question: Does the organization proactively govern Technology Assets, Applications and/or Services (TAAS) by: (1) Defining technical security, compliance and resilience requirements; and (2) Performing a criticality analysis at predefined decision points in the Secure Development Life Cycle (SDLC)?

General (44)
Framework Mapping Values
AICPA TSC 2017:2022 (used for SOC 2) (source) CC2.2 CC4.1 CC5.2 PI1.1-POF1 PI1.1-POF2 PI1.1-POF3
BSI Standard 200-1 4.1.4
CIS CSC 8.1 15.7
CIS CSC 8.1 IG3 15.7
COBIT 2019 APO01.10 APO08.01 BAI01.04 BAI02.01 BAI03.01 BAI03.03 BAI03.04
COSO 2013 11.0 14.0 16.0
CSA IoT SCF 2 LGL-01 LGL-02 LGL-03 LGL-04 LGL-05 LGL-06 LGL-07 LGL-08
ISO/SAE 21434 2021 RQ-06-02 RQ-06-02(a) RQ-06-02(b) RQ-06-02(c) RQ-06-03 RQ-06-03(a) RQ-06-03(b) RQ-06-03(c) RQ-06-03(d) RQ-06-03(e) RQ-06-03(f) RQ-06-19 RQ-06-33(c) RQ-10-02
ISO 27002 2022 5.8 5.9 8.26
ISO 27017 2015 6.1.5 8.1.1 14.1.1
ISO 27018 2025 5.8 5.9 8.26
ISO 27701 2025 6.1.1
ISO 31000 2018 5.4.1
ISO 31010 2009 4.3.2
ISO 42001 2023 4.1 4.2 A.4.2 A.6.2.2
NIST AI 100-1 (AI RMF) 1.0 MAP 1.6
NIST 800-37 R2 TASK P-8
NIST 800-53 R4 SA-14
NIST 800-53 R5.2 RA-09
NIST 800-53B R5 (moderate) (source) RA-09
NIST 800-53B R5 (high) (source) RA-09
NIST 800-82 R3 RA-09
NIST 800-82 R3 MODERATE OT Overlay RA-09
NIST 800-82 R3 HIGH OT Overlay RA-09
NIST 800-160 Vol2 R1 RA-09
NIST 800-161 R1 RA-9
NIST 800-161 R1 Flow Down RA-9
NIST 800-161 R1 Level 1 RA-9
NIST 800-161 R1 Level 2 RA-9
NIST 800-161 R1 Level 3 RA-9
NIST 800-171 R3 (source) 03.16.01
NIST 800-171A R3 (source) A.03.16.01
NIST 800-172 R3 03.11.10E 03.13.01E 03.13.02E 03.13.03E
NIST 800-172A R3 DS-A.03.11.10E A.03.13.01E.ODP[01] A.03.13.02E.ODP[01] A.03.13.03E.ODP[01]
NIST 800-218 PO.1 PO.1.1
NIST Privacy Framework 1.0 CT.PO-P1
OWASP Top 10 2025 A06:2025
PCI DSS 4.0.1 (source) 1.1
SCF DPMP 2026 5.12
SWIFT CSF 2025 2.8 2.11A
TISAX ISA 6.0.3 1.2.3 5.3.2 8.3.1
UL 2900-1 2017 12.1(a)
UN R155 7.2.2.5
UN ECE WP.29 7.2.2.5
US (8)
EMEA (14)
Framework Mapping Values
EMEA CHE FINMA Circular 2023/1 IV.B.b-52
EMEA Germany BAIT 2017 7.6
EMEA Spain CCN-STIC 825 op.pl.2 op.pl.3 op.exp.1 mp.info.4 mp.s.2
EMEA Spain Royal Decree 311 2022 Article 13(2)(a) Article 13(2)(b)
EMEA EU AI Act Article 14.3(b)
EMEA EU DORA 2023 Article 7(a) Article 7(b) Article 7(c) Article 7(d)
EMEA EU DORA RTS 2024 Article 16.1(b) Article 37.1(a)
EMEA EU EBA GL/2019/04 3.6.1.64 3.6.2.68
EMEA EU NIS2 2022 Article 21.3
EMEA EU NIS2 Annex 2024 6.2.2(a)
EMEA LUX CCSF 20/750 2020 3.6.1-64 3.6.2-68
EMEA Saudi Arabia CSCC-1 2019 2-13-1 2-13-2
EMEA Saudi Arabia ECC-1 2018 1-6-1 2-9-1
EMEA Saudi Arabia OTCC-1 2022 1-4-1-1
APAC (10)
Framework Mapping Values
APAC Australia CCM 2026 IDE-03 IDE-06
APAC Australia ISM June 2026 ISM-0720 ISM-1739
APAC Australia Prudential Standard CPS230 2023 25
APAC India RBI Digital Payments 2021 21.0
APAC Japan ISMAP 4.4.3.1 4.4.5.2 4.5.1.1 6.1.5.2 14.1.1.2
APAC Malaysia RMiT 2025 10.2(d)
APAC New Zealand HISF MLHSP 2023 HHSP11 HHSP28 HHSP31 HML31
APAC New Zealand HISF Suppliers 2023 HSUP27
APAC New Zealand NZISM 3.9 12.1.30.C.01 12.1.30.C.02 12.1.30.C.03 12.1.32.C.01 12.1.32.C.02 12.1.32.C.03
APAC Singapore MAS TRM 2021 5.1.2 5.4.2 5.4.3 5.5.1
Americas (4)

Capability Maturity Model

Level 0 — Not Performed

Practices are non-existent, based on the inability to demonstrate an implemented and operational capability. A reasonable person would conclude the control is not being performed.

Level 1 — Performed Informally

Project & Resource Management (PRM) domain capabilities are ad hoc and inconsistent. Capability criteria associated with this control may include: ▪ Policies, standards & procedures associated with PRM domain capabilities provide limited coverage due to the depth and breadth of the existing documentation. ▪ Project management-related activities are decentralized (e.g., a localized/regionalized function) and uses non-standardized methods to implement secure, resilient and compliant practices. ▪ IT and/or cybersecurity personnel work with data/process owners to help ensure secure practices are implemented throughout the System Development Lifecycle (SDLC) for all high-value projects.

Level 2 — Planned & Tracked

Project & Resource Management (PRM) capabilities are requirements-driven, but are not standardized across the entity (e.g., local/regional level consistency). Capability criteria associated with this control reasonably expect the following criteria to exist: ▪ Policies and standards associated with PRM domain capabilities are formally documented and centrally-managed by the entity. ▪ Standardized Operating Procedures (SOP) associated with PRM domain capabilities are documented and maintained by process owners. ▪ IT and/or cybersecurity personnel work with business stakeholders and process owners to appropriately scope and reasonably implement cybersecurity and data protection controls associated with PRM domain capabilities to address applicable statutory, regulatory and/or contractual requirements for Technology Assets, Applications, Services and/or Data (TAASD). ▪ Project & Resource Management -related controls are primarily administrative and preventative in nature (e.g., policies, standards and procedures & guidelines). ▪ Project & Resource Management may be a defined function (e.g., team or department) or assigned as an additional duty to existing IT and/or cybersecurity personnel. ▪ The Chief Information Officer (CIO), or similar function, analyzes the organization's business strategy and prioritizes the objectives and resourcing of the security function, based on broader business requirements. ▪ A Project Management Office (PMO), or project management function, enables the implementation of cybersecurity and data protection-related resource planning controls across the System Development Lifecycle (SDLC) for all high-value projects. ▪ The PM function enables project involvement for Information Assurance Program (IAP) as part of the organization's established project management processes to ensure both cybersecurity and data protection principles are identified and implemented.

Level 3 — Well Defined

Project & Resource Management (PRM) capabilities are standardized across the entity for applicability to People, Processes, Technologies, Data and/or Facilities (PPTDF) to ensure consistency for Technology Assets, Applications, Services and/or Data (TAASD). Capability criteria associated with this control reasonably expect the following criteria to exist: ▪ Policies and standards associated with PRM domain capabilities are formally documented and centrally-managed by the entity's Governance, Risk & Compliance (GRC) team, or similar function. ▪ Standardized Operating Procedures (SOP) associated with PRM domain capabilities are well-documented and kept current by process owners. ▪ A Project Management Office (PMO), or similar function, is appropriately staffed and supported to implement and maintain PRM domain capabilities. ▪ Technology is leveraged to enhance the efficiency and accuracy of project and resource management operations (e.g., project management solution). ▪ The entity's Governance, Risk & Compliance (GRC) team, or similar function, works with business stakeholders and process owners to appropriately scope and reasonably implement cybersecurity and data protection controls associated with PRM domain capabilities to address Minimum Compliance Requirements (MCR) (e.g., applicable statutory, regulatory and/or contractual requirements) and Discretionary Security Requirements (DSR) (e.g., entity-required controls). ▪ The Chief Information Officer (CIO), or similar function, analyzes the organization's business strategy and prioritizes the objectives and resourcing of the security function, based on broader business requirements. ▪ An implemented and operational capability exists to identify critical system components and functions by performing a criticality analysis for critical Technology Assets, Applications and/or Services (TAAS) at pre-defined decision points in the Secure Development Life Cycle (SDLC).

Level 4 — Quantitatively Controlled

Project & Resource Management (PRM) capabilities, in addition to being standardized across the entity and centrally managed to ensure consistency across Technology Assets, Applications, Services and/or Data (TAASD), efforts are metrics driven to provide sufficient insight for decision makers to predict optimal performance, ensure continued operations and/or identify areas for improvement. Capability criteria associated with this control reasonably expect the following criteria to exist: ▪ Applicable SCR-CMM Level 3 (Well Defined) capabilities are implemented and operational. ▪ Metrics reporting includes quantitative analysis of Key Performance Indicators (KPIs). ▪ Metrics reporting includes quantitative analysis of Key Risk Indicators (KRIs). ▪ Scope of metrics, KPIs and KRIs covers organization-wide cybersecurity and data protection controls, including functions performed by third-parties. ▪ Organizational leadership maintains a formal process to objectively review and respond to metrics, KPIs and KRIs (e.g., monthly or quarterly review). ▪ Based on metrics analysis, process improvement recommendations are submitted for review and are handled in accordance with change control processes. ▪ Business and technical stakeholders are involved in reviewing and approving proposed changes to evolve capabilities.

Level 5 — Continuously Improving

Utilize SCR-CMM Level 3 or Level 4 (if available) criteria definitions: ▪ There are no defined Level 5 criteria, since it is reasonable to assume a continuously-improving process is not necessary to operationalize this control. ▪ Level 5 capabilities should be considered “world-class” where the control builds on Level 4 capabilities, but are continuously improving through Artificial Intelligence (AI) and/or Machine Learning (ML) technologies. ▪ While it may be possible to develop responsive capabilities for this control through the use of AI and/or ML technologies, the criteria would be organization-specific to define.

Assessment Objectives

  1. PRM-09_A01 systems, system components or system services to be analyzed for criticality are defined.
  2. PRM-09_A02 decision points in the system development life cycle when a criticality analysis is to be performed are defined.
  3. PRM-09_A03 critical system components and functions are identified by performing a criticality analysis for systems, system components or system services at decision points in the system development life cycle.

Evidence Requirements

E-PRM-03 Secure Development Lifecycle (SDLC)

Documented evidence of a secure development lifecycle that the organization utilizes for new initiatives or significant changes to existing initiatives to ensure cybersecurity & data privacy principles are identified and implemented by default.

Resource Management
E-PRM-05 System Design Document (SDD)

Documented evidence of a System Design Document (SDD) focuses on how a Technology Asset, Application and/or Service (TAAS) is built (e.g., architecture, components, data flow, functions, etc.).

Resource Management

Technology Recommendations

Micro/Small

  • Defined technical requirements
  • Defined business requirements

Small

  • Defined technical requirements
  • Defined business requirements

Medium

  • Defined technical requirements
  • Defined business requirements
  • System Development Lifecycle (SDLC) governance / oversight

Large

  • Defined technical requirements
  • Defined business requirements
  • System Development Lifecycle (SDLC) governance / oversight

Enterprise

  • Defined technical requirements
  • Defined business requirements
  • System Development Lifecycle (SDLC) governance / oversight

The Secure Controls Framework (SCF) is maintained by SCF Council. Use of SCF content is subject to the SCF Terms & Conditions.

Manage this control in SCF Connect

Track implementation status, collect evidence, and map controls to your compliance frameworks automatically.