MNT-05.4: Remote Maintenance Disconnect Verification
Mechanisms exist to provide remote disconnect verification to ensure remote, non-local maintenance and diagnostic sessions are properly terminated.
Control Question: Does the organization provide remote disconnect verification to ensure remote, non-local maintenance and diagnostic sessions are properly terminated?
General (14)
| Framework | Mapping Values |
|---|---|
| NIST 800-53 R4 | MA-4(7) |
| NIST 800-53 R5 (source) | MA-4(7) |
| NIST 800-53 R5 (NOC) (source) | MA-4(7) |
| NIST 800-171 R2 (source) | 3.7.5 |
| NIST 800-171 R3 (source) | 03.07.05.c |
| NIST 800-171A R3 (source) | A.03.07.05.c[01] |
| PCI DSS 4.0.1 (source) | 8.2.7 |
| PCI DSS 4.0.1 SAQ A-EP (source) | 8.2.7 |
| PCI DSS 4.0.1 SAQ B-IP (source) | 8.2.7 |
| PCI DSS 4.0.1 SAQ C (source) | 8.2.7 |
| PCI DSS 4.0.1 SAQ D Merchant (source) | 8.2.7 |
| PCI DSS 4.0.1 SAQ D Service Provider (source) | 8.2.7 |
| SCF CORE ESP Level 2 Critical Infrastructure | MNT-05.4 |
| SCF CORE ESP Level 3 Advanced Threats | MNT-05.4 |
US (3)
| Framework | Mapping Values |
|---|---|
| US CMMC 2.0 Level 2 (source) | MA.L2-3.7.5 |
| US HIPAA HICP Large Practice | 5.L.A |
| US IRS 1075 | MA-4(7) |
EMEA (1)
| Framework | Mapping Values |
|---|---|
| EMEA Israel CDMO 1.0 | 4.18 4.20 12.7 |
Americas (1)
| Framework | Mapping Values |
|---|---|
| Americas Canada ITSP-10-171 | 03.07.05.C |
Capability Maturity Model
Level 0 — Not Performed
There is no evidence of a capability to provide remote disconnect verification to ensure remote, non-local maintenance and diagnostic sessions are properly terminated.
Level 1 — Performed Informally
C|P-CMM1 is N/A, since a structured process is required to provide remote disconnect verification to ensure remote, non-local maintenance and diagnostic sessions are properly terminated.
Level 2 — Planned & Tracked
Maintenance (MNT) efforts are requirements-driven and governed at a local/regional level, but are not consistent across the organization. CMM Level 2 control maturity would reasonably expect all, or at least most, the following criteria to exist: o Identify cybersecurity and data protection controls to appropriately address applicable statutory, regulatory and contractual requirements for technology asset maintenance. o Develop and disseminate formal guidance to facilitate a localized/regionalized process to implement secure and timely technology asset-specific maintenance operations, including preventative and reactionary maintenance operations.
- Technology asset maintenance is decentralized (e.g., a localized/regionalized function) and uses non-standardized methods to implement secure, resilient and compliant practices.
- IT/cybersecurity personnel:
- Maintenance controls are primarily administrative in nature (e.g., policies & standards) to manage change control processes associated with maintenance operations.
- Asset custodians develop and maintain formalized procedures to conduct controlled and timely maintenance activities throughout the lifecycle of the system, application or service.
- Maintenance operations may be centralized for certain locations (e.g., datacenters) and decentralized for other locations, both in terms of change management and execution.
- Facilities management uses a localized/regionalized process to facilitate the secure and timely implementation of non-IT maintenance operations, including preventative and reactionary maintenance operations.
- Administrative processes and technologies exist to provide remote disconnect verification to ensure non-local maintenance and diagnostic sessions are properly terminated.
Level 3 — Well Defined
Maintenance (MNT) efforts are standardized across the organization and centrally managed, where technically feasible, to ensure consistency. CMM Level 3 control maturity would reasonably expect all, or at least most, the following criteria to exist:
- IT/cybersecurity personnel develop and disseminate formal practices to implement enterprise-wide capability to conduct secure and timely technology asset-specific maintenance operations, including preventative and reactionary maintenance operations.
- Technology asset-related maintenance operations are centralized in terms of change management and governance. Local/regional practices fall under the broader enterprise-wide technology asset maintenance program.
- Facilities management uses an enterprise-wide process to facilitate the secure and timely implementation of non-IT maintenance operations, including preventative and reactionary maintenance operations. Local/regional practices fall under the broader enterprise-wide facilities management program.
- A Change Control Board (CCB), or similar function, centrally manages the process of IT and non-IT maintenance operations to reduce the chance of business interruptions from maintenance operations.
- Administrative processes and technologies exist to provide remote disconnect verification to ensure non-local maintenance and diagnostic sessions are properly terminated.
Level 4 — Quantitatively Controlled
Maintenance (MNT) efforts are metrics driven and provide sufficient management insight (based on a quantitative understanding of process capabilities) to predict optimal performance, ensure continued operations and identify areas for improvement. In addition to CMM Level 3 criteria, CMM Level 4 control maturity would reasonably expect all, or at least most, the following criteria to exist:
- Metrics reporting includes quantitative analysis of Key Performance Indicators (KPIs).
- Metrics reporting includes quantitative analysis of Key Risk Indicators (KRIs).
- Scope of metrics, KPIs and KRIs covers organization-wide cybersecurity and data protection controls, including functions performed by third-parties.
- Organizational leadership maintains a formal process to objectively review and respond to metrics, KPIs and KRIs (e.g., monthly or quarterly review).
- Based on metrics analysis, process improvement recommendations are submitted for review and are handled in accordance with change control processes.
- Both business and technical stakeholders are involved in reviewing and approving proposed changes.
Level 5 — Continuously Improving
See C|P-CMM4. There are no defined C|P-CMM5 criteria, since it is reasonable to assume a continuously-improving process is not necessary to provide remote disconnect verification to ensure remote, non-local maintenance and diagnostic sessions are properly terminated.
Assessment Objectives
- MNT-05.4_A01 session connections are terminated when nonlocal maintenance is completed.
- MNT-05.4_A02 session connection termination is verified after the completion of nonlocal maintenance and diagnostic sessions.
- MNT-05.4_A03 network connection termination is verified after the completion of nonlocal maintenance and diagnostic sessions.
Technology Recommendations
Micro/Small
- Secure Baseline Configurations (SBC)
Small
- Secure Baseline Configurations (SBC)
Medium
- Secure Baseline Configurations (SBC)
Large
- Secure Baseline Configurations (SBC)
Enterprise
- Secure Baseline Configurations (SBC)