MNT-05: Remote Maintenance
Mechanisms exist to authorize, monitor and control remote, non-local maintenance and diagnostic activities.
Control Question: Does the organization authorize, monitor and control remote, non-local maintenance and diagnostic activities?
General (42)
US (24)
| Framework | Mapping Values |
|---|---|
| US CERT RMM 1.2 | AM:SG1.SP1 TM:SG4.SP1 TM:SG5.SP2 |
| US CJIS Security Policy 5.9.3 (source) | MA-4 |
| US CMMC 2.0 Level 2 (source) | MA.L2-3.7.5 |
| US CMMC 2.0 Level 3 (source) | MA.L2-3.7.5 |
| US CMS MARS-E 2.0 | MA-4 |
| US DHS ZTCF | ACC-04 |
| US FedRAMP R4 | MA-4 |
| US FedRAMP R4 (low) | MA-4 |
| US FedRAMP R4 (moderate) | MA-4 |
| US FedRAMP R4 (high) | MA-4 |
| US FedRAMP R4 (LI-SaaS) | MA-4 |
| US FedRAMP R5 (source) | MA-4 |
| US FedRAMP R5 (low) (source) | MA-4 |
| US FedRAMP R5 (moderate) (source) | MA-4 |
| US FedRAMP R5 (high) (source) | MA-4 |
| US FedRAMP R5 (LI-SaaS) (source) | MA-4 |
| US FFIEC | D3.PC.Im.B.7 |
| US HIPAA HICP Medium Practice | 9.M.A 9.M.B |
| US HIPAA HICP Large Practice | 9.M.A 9.M.B 5.L.A |
| US IRS 1075 | MA-4 |
| US TSA / DHS 1580/82-2022-01 | III.C |
| US - TX DIR Control Standards 2.0 | MA-4 |
| US - TX TX-RAMP Level 1 | MA-4 |
| US - TX TX-RAMP Level 2 | MA-4 |
EMEA (5)
| Framework | Mapping Values |
|---|---|
| EMEA EU NIS2 Annex | 6.7.2(h) |
| EMEA Israel CDMO 1.0 | 4.18 12.7 |
| EMEA Saudi Arabia OTCC-1 2022 | 2-2-1-7 |
| EMEA Saudi Arabia SACS-002 | TPC-35 |
| EMEA UK DEFSTAN 05-138 | 2512 |
APAC (1)
| Framework | Mapping Values |
|---|---|
| APAC India SEBI CSCRF | PR.MA.S2 |
Americas (1)
| Framework | Mapping Values |
|---|---|
| Americas Canada ITSP-10-171 | 03.01.12.D 03.07.05.A 03.07.05.B 03.07.05.C |
Capability Maturity Model
Level 0 — Not Performed
There is no evidence of a capability to authorize, monitor and control remote, non-local maintenance and diagnostic activities.
Level 1 — Performed Informally
Maintenance (MNT) efforts are ad hoc and inconsistent. CMM Level 1 control maturity would reasonably expect all, or at least most, the following criteria to exist:
- IT personnel use an informal process to implement secure and timely technology asset-specific maintenance operations, including preventative and reactive maintenance operations.
- Facilities management uses an informal process to facilitate the secure and timely implementation of non-IT maintenance operations, including preventative and reactive maintenance operations.
- Maintenance operations are decentralized both in terms of change management and execution.
Level 2 — Planned & Tracked
Maintenance (MNT) efforts are requirements-driven and governed at a local/regional level, but are not consistent across the organization. CMM Level 2 control maturity would reasonably expect all, or at least most, the following criteria to exist: o Identify cybersecurity and data protection controls to appropriately address applicable statutory, regulatory and contractual requirements for technology asset maintenance. o Develop and disseminate formal guidance to facilitate a localized/regionalized process to implement secure and timely technology asset-specific maintenance operations, including preventative and reactionary maintenance operations.
- Technology asset maintenance is decentralized (e.g., a localized/regionalized function) and uses non-standardized methods to implement secure, resilient and compliant practices.
- IT/cybersecurity personnel:
- Maintenance controls are primarily administrative in nature (e.g., policies & standards) to manage change control processes associated with maintenance operations.
- Asset custodians develop and maintain formalized procedures to conduct controlled and timely maintenance activities throughout the lifecycle of the system, application or service.
- Maintenance operations may be centralized for certain locations (e.g., datacenters) and decentralized for other locations, both in terms of change management and execution.
- Facilities management uses a localized/regionalized process to facilitate the secure and timely implementation of non-IT maintenance operations, including preventative and reactionary maintenance operations.
- Administrative processes and technologies exist to authorize, monitor and control non-local maintenance and diagnostic activities.
- Technologies are configured to use cryptographic mechanisms to protect the integrity and confidentiality of non-local maintenance and diagnostic communications.
Level 3 — Well Defined
Maintenance (MNT) efforts are standardized across the organization and centrally managed, where technically feasible, to ensure consistency. CMM Level 3 control maturity would reasonably expect all, or at least most, the following criteria to exist:
- IT/cybersecurity personnel develop and disseminate formal practices to implement enterprise-wide capability to conduct secure and timely technology asset-specific maintenance operations, including preventative and reactionary maintenance operations.
- Technology asset-related maintenance operations are centralized in terms of change management and governance. Local/regional practices fall under the broader enterprise-wide technology asset maintenance program.
- Facilities management uses an enterprise-wide process to facilitate the secure and timely implementation of non-IT maintenance operations, including preventative and reactionary maintenance operations. Local/regional practices fall under the broader enterprise-wide facilities management program.
- A Change Control Board (CCB), or similar function, centrally manages the process of IT and non-IT maintenance operations to reduce the chance of business interruptions from maintenance operations.
- Administrative processes and technologies exist to authorize, monitor and control non-local maintenance and diagnostic activities.
- Technologies are configured to use cryptographic mechanisms to protect the integrity and confidentiality of non-local maintenance and diagnostic communications.
Level 4 — Quantitatively Controlled
Maintenance (MNT) efforts are metrics driven and provide sufficient management insight (based on a quantitative understanding of process capabilities) to predict optimal performance, ensure continued operations and identify areas for improvement. In addition to CMM Level 3 criteria, CMM Level 4 control maturity would reasonably expect all, or at least most, the following criteria to exist:
- Metrics reporting includes quantitative analysis of Key Performance Indicators (KPIs).
- Metrics reporting includes quantitative analysis of Key Risk Indicators (KRIs).
- Scope of metrics, KPIs and KRIs covers organization-wide cybersecurity and data protection controls, including functions performed by third-parties.
- Organizational leadership maintains a formal process to objectively review and respond to metrics, KPIs and KRIs (e.g., monthly or quarterly review).
- Based on metrics analysis, process improvement recommendations are submitted for review and are handled in accordance with change control processes.
- Both business and technical stakeholders are involved in reviewing and approving proposed changes.
Level 5 — Continuously Improving
Maintenance (MNT) efforts are “world-class” capabilities that leverage predictive analysis (e.g., machine learning, AI, etc.). In addition to CMM Level 4 criteria, CMM Level 5 control maturity would reasonably expect all, or at least most, the following criteria to exist:
- Stakeholders make time-sensitive decisions to support operational efficiency, which may include automated remediation actions.
- Based on predictive analysis, process improvements are implemented according to “continuous improvement” practices that affect process changes.
Assessment Objectives
- MNT-05_A01 nonlocal maintenance and diagnostic activities are approved.
- MNT-05_A02 nonlocal maintenance and diagnostic activities are monitored.
- MNT-05_A03 the use of nonlocal maintenance and diagnostic tools are allowed only as consistent with organizational policy.
- MNT-05_A04 the use of nonlocal maintenance and diagnostic tools are documented in the security plan for the system.
- MNT-05_A05 strong authentication is employed in the establishment of nonlocal maintenance and diagnostic sessions.
- MNT-05_A06 records for nonlocal maintenance and diagnostic activities are maintained.
- MNT-05_A07 session connections are terminated when nonlocal maintenance is completed.
- MNT-05_A08 network connections are terminated when nonlocal maintenance is completed.
- MNT-05_A09 multifactor authentication is used to establish nonlocal maintenance sessions via external network connections.
- MNT-05_A10 nonlocal maintenance sessions established via external network connections are terminated when nonlocal maintenance is complete.